Skip to main content

What is the commissioning work of hydraulic drilling rigs before construction?

 Hydraulic drilling rig in the construction of careful debugging before work, is to ensure the normal operation of equipment, improve construction efficiency, to ensure the safety of an important link.

water well drilling rig

The following is a detailed introduction to the commissioning of hydraulic drilling rigs before construction:

Hydraulic drilling rig commissioning work before construction
1. Check the hydraulic system
Fluid check: check whether the level of hydraulic oil in the prescribed range, whether the oil is clean, there are no impurities or emulsification.
Oil pipe inspection: check whether all the hydraulic oil pipe is intact, whether the connection is tight, there is no oil leakage phenomenon.
Hydraulic components check: check hydraulic pumps, hydraulic valves, hydraulic cylinders and other components work properly, there is no abnormal noise or leakage.
2. Check the mechanical transmission system
Transmission shaft inspection: check whether the transmission shaft is deformed, loose or cracked.
Gear check: check whether the gear is worn, missing teeth or loose.
Coupling check: check whether the coupling is loose or damaged.
Lubrication system check: Check whether the lubrication points are filled with sufficient lubricant.
3. Check the safety devices
Safety valve check: Check whether the safety valve is sensitive and reliable, and whether the setting pressure is correct.
Limit switch check: check whether the limit switch can effectively prevent the hydraulic cylinder over-travel.
Emergency stop device check: check whether the emergency stop device can quickly cut off the power.
4. Check the drilling tools
Drill Bit Check: Check the drill bit for sharpness, cracks or wear.
Drill pipe inspection: Check the drill pipe for bends, cracks or damaged threads.
Drilling tool connection check: Check whether the connection of each part of the drilling tool is firm.
Purpose of commissioning
Ensure the normal operation of the equipment: through commissioning, you can find and eliminate the hidden problems of the equipment at an early stage to ensure the normal operation of the equipment.
Improve construction efficiency: well commissioned equipment can improve drilling speed and drilling quality, and improve construction efficiency.
Ensure construction safety: commissioning can find and eliminate potential safety hazards to ensure the safety of construction personnel.
Summarize
The commissioning of hydraulic drilling rigs before construction is an important link to ensure the smooth progress of construction. Through comprehensive inspection and debugging of the hydraulic system, mechanical transmission system, electrical system, safety devices, etc., the reliability of the equipment can be ensured, the construction efficiency can be improved, and the construction safety can be ensured.

If you don't know how to choose the right water well drilling rig, click the link below to contact our professional team directly.

Contact us (gzpearldrill.com)

Comments

Popular posts from this blog

What are the Basic Maintenance Methods for Water Well Drilling Rigs

  Cleaning: After every day's operation, clean the mud, oil, and other debris on the rig in time to keep the rig clean. Checking lubrication: regularly check  the lubrication points to ensure that the lubricant is sufficient and the grease is clean. Fasteners check: you can check whether the bolts and nuts of each part are loose and tighten them in time. Hydraulic system checks: you can check whether the hydraulic oil level is normal, whether there is no leakage phenomenon, and whether the hydraulic oil is clean. Lubrication system maintenance: regular replacement of lubricating oil, grease, cleaning oil filter, and oil tank. Hydraulic system maintenance: regular replacement of hydraulic oil, cleaning hydraulic filter. Cooling system maintenance: clean the radiator, and check the coolant level. Transmission system maintenance: check the tightness of the transmission belt, and replace the worn transmission belt. Electrical system maintenance: check whether the line is firm...

Profile of Guangzhou International Technology Co., Ltd.

    Guangzhou International Technology Co., Ltd.  is a product group company mainly engaged in industrial equipment and accessories. Pearldrill is one of our subsidiary companies that produces and sells drilling equipment and tools. The drilling products of our company include the following categories: 1. Water well  drilling rig s 2. PDC Drilling Bits 3. Slurry  pumps  and  mud pump s 4. Drilling Accessories including drilling pipe etc. Our website list: 1. EC21:  https://pearldrill.en.ec21.com/ 2. DIYTRADE:  https://pearldrill.diytrade.com/ 3. ENFSOLAR:  https://www.enfsolar.com/member/my_space

How to get the lowest price of PDC drill bits from supplier

If you wanna get the lowest price for   PDC Drill Bit s from a supplier, the following strategies you should employ : 1. Research Multiple Suppliers: Identify and research multiple suppliers or manufacturers of PDC drill bits. Look for reputable companies with a track record of delivering high-quality products. Having multiple options allows you to compare prices and negotiate effectively. 2. Request Quotes: Reach out to the suppliers and request quotes for the PDC drill bits you require. Provide them with the specific details of your drilling project, such as the quantity of drill bits needed, desired specifications, and any customization requirements. Ensure that the quotes provided are comprehensive and include all relevant costs. 3. Compare Prices and Terms: Compare the quotes received from different suppliers. Pay attention not only to the price but also to the terms and conditions offered, such as warranty, delivery time, payment terms, and after-sales support. A lower price ...